报错信息如下:
WARNING! Potentially linear dependencies in the auxiliary basis
===>> At the moment, SHARK is not equipped to deal with this
[file orca_tools/Tool-GTO-Integrals/SHARK/shark.cpp, line 334, Process 0]: ... sorry, have to bail out
ORCA finished by error termination in GTOInt
Calling Command: mpirun -np 4 /opt/QC/orca/5.0.3/orca_gtoint_mpi /scratch/wangxm/ORCA/rev_DSD_S0_td.50473/rev_DSD_S0_td.int.tmp /scratch/wangjy/ORCA/r ev_DSD_S0_td.50473/rev_DSD_S0_td
[file orca_tools/qcmsg.cpp, line 465]:
.... aborting the run